 1、小称重机的课程指导 

Small weighing machine course instruction


↓↓↓

1、称重机的开机准备工作Start up the weighing machine preparation

2、大称重机的课程指导 

Lesson instruction on the big weighing machine

维护保养及注意事项

Maintenance and precautions

1、保证仪表清晰和使用寿命,本仪表不宜放在阳光直射下使用。

To ensure the clarity and service life of the instrument, the instrument should not be used in direct sunlight.

2、不宜放在粉尘及振动严重的地方使用,避免在潮湿的环境重使用。

It is not suitable for use in places with serious dust and vibration. Avoid reuse in humid environments.

3、传感器和仪表须可靠连接,系统应有良好的接地,远离强电场、强磁场,传感器和仪表应远离强腐蚀性物体,远离易燃易爆物体。

The sensor and meter must be connected reliably. The system must be well grounded and away from strong electric field and magnetic field. The sensor and meter must be away from corrosive objects and inflammable and explosive objects.

4、不要在可燃性气体或可燃性蒸汽的使用;不得使用在压力容器罐装系统。在雷电频繁发生的地区,必须安装可靠的避雷器,以确保操作人员人身安全,防止雷击损坏仪表及相应设备。

Do not use flammable gas or steam; Do not use in pressure vessel canning systems. In areas where lightning frequently occurs, reliable lightning arresters must be installed to ensure the safety of operators and prevent lightning damage to instruments and corresponding equipment.

5、传感器和仪表都是静电敏感设备,在使用中必须切实采取防静电措施,严禁在称台上进行电焊操作或其他强电场的操作;在雷雨季节,必须落实可靠的避雷措施,防止因雷击造成传感器和仪表的损坏,确保操作人员人身安全和称重设备及相关设备的安全运行。

Sensors and instruments are electrostatic sensitive equipment, in the use of anti-static measures must be taken, do not carry out electric welding operation or other strong electric field operation on the weighing table; In the thunderstorm season, it is necessary to implement reliable lightning protection measures to prevent the damage of sensors and instruments caused by lightning, and ensure the personal safety of operators and the safe operation of weighing equipment and related equipment.

6、在插拔传感器联接线前,必须先切断仪表电源(关机)

Before inserting and removing the sensor connection wire, the instrument power supply must be cut off first (shutdown).

7、在插拔通讯等外部接口联结前,必须切断仪表和外设电源。

Before inserting and removing communication and other external interfaces, the instrument and peripheral power must be cut off.